Military Industrial Complex

Defense Contracts for 12/31/2009

Authored By Staff Writer | Last Updated: 5/17/2014

Because every contract becomes part of the overall MiC story - defense contracts announced for 12/31/2009.

Tweet

Contracts listed below were reported by the United States Department of Defense on 12/31/2009. There were a total of 26 defense contracts reported. * Indicates a "small business" classification per the US DoD. ** indicates a "small disadvantaged business" per the US DoD. NOTE: the US DoD only publicly reports contracts valued at $6.5 million USD or greater.


Principle Contractor: General Atomics Aeronautical Systems, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Air Force [ VIEW ALL ]

Contract Details: General Atomics Aeronautical Systems, Inc, Poway, Calif., was awarded a $266,055,622 contract for program management; urgent repairs and services; logistics support; configuration management; technical manual and software maintenance; engineering technical services; contract engineering technical specialists; contractor inventory control point and spares management; depot repair; flight; operations support; reliability/maintenance enhancements; and CAMS/REMIS/CEMS data collection entry for the Predator/Reaper MQ-1 and MQ-9 unmanned aircraft system program. At this time, $53,211,124.4 has been obligated. 703rd Aeronautical Systems Squadron, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8620-05-G-3028).
Total Contract Value: $266,055,622

Principle Contractor: Boeing Company [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Air Force [ VIEW ALL ]

Contract Details: Boeing Co., Long Beach, Calif., was awarded a $263,581,484 modified contract for the basic C-17 Globemaster III sustainment partnership contract that provides total systems support responsibility to Boeing for the C-17 weapon system to include program management; sustaining logistics; material and equipment management; sustainment engineering; depot level aircraft maintenance; engine management; long term sustainment planning; air logistics center partnering support; depot activation; and support of Air Force and Foreign Military Sales operator of the C-17. At this time, the entire amount has been obligated. 730 ACSG/GFKAA, Robins Air Force Base, Ga, is the contracting activity (FA8614-04-C-2004).
Total Contract Value: $263,581,484

Principle Contractor: Raytheon Company [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Air Force [ VIEW ALL ]

Contract Details: Raytheon Co, McKinney, Texas, was awarded a $38,078,612 contract to provide for CY10 contractor logistics support of the multi-spectral targeting system for the MQ-1 Predator and MQ-9 Reaper remotely piloted aircraft systems. At this time, $12,565,938 has been obligated. 703 AESG/SYK, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8620-06-G-4041).
Total Contract Value: $38,078,612

Principle Contractor: Zachry Construction Corporation [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Zachry Construction Corp., San Antonio, Texas, was awarded on Dec. 21, 2009, a $22,376,777 firm-fixed-price contract for construct channel improvement, mission reach, Phase 2a. Work will be performed in San Antonio, Texas, with an estimated completion date of Feb. 10, 2011. Bids were solicited via the World Wide Web with six bids received. U.S. Army Corps of Engineers, Fort Worth District, Fort Worth, Texas, is the contracting activity (W9126G-10-C-0007).
Total Contract Value: $22,376,777

Principle Contractor: Honeywell International [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Honeywell International, Tempe, Ariz., was awarded on Dec. 23, 2009, a $22,194,580 firm-fixed-price contract for 1,227 J7 digital electronic control units and six J7 digital electronic control unit control tests. Work is to be performed in Tucson, Ariz., with an estimated completion date of March 30, 2011. One bid was solicited with one bid received. TACOM Contracting Center, Warren, Mich., is the contracting activity (W56HZV-10-C-0121).
Total Contract Value: $22,194,580

Principle Contractor: David Boland, Incorporate [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: David Boland, Inc., Titusville, Fla., was awarded on Dec. 23, 2009, a $20,869,748 firm-fixed-price contract. This contract is for HUBZone MATOC, West Banks and vicinity, WBV-24 Segnette State Park floodwall. Work is to be performed in Jefferson Parish, La., with an estimated completion date of June 24, 2011. Bids were solicited via the World Wide Web with 13 bids received. U.S. Army Corps of Engineers, New Orleans, District, New Orleans, La., is the contracting activity (W912P8-10-C-0026).
Total Contract Value: $20,869,748

Principle Contractor: L B Foster Company [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: L.B. Foster Co., Pittsburgh, Pa., was awarded on Dec. 22, 2009, an $18,068,310 fixed-price contract for supply, transport, storage and maintenance of various lengths of sheetpile in New Orleans, La. Work is to be performed at various locations in Louisiana, with an estimated completion date of July 21, 2011. Bids were solicited via the FedBizOpps Web site and Army Single Face to Industry, with three bids received. U.S. Army Corps of Engineers, Hurricane Protection Office, New Orleans, La., is the contracting activity (W912P8-10-C-0031).
Total Contract Value: $18,068,310

Principle Contractor: IAP Worldwide Services [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: IAP Worldwide Services, Panama City, Fla., was awarded on Dec. 18, 2009, a $16,642,697 firm-fixed-price contract for line haul transportation within Kuwait and Iraq. Work is to be performed in Kuwait and Iraq with an estimated completion date of June 30, 2010. One bid was solicited with one bid received. Army Contracting Center, RICC-CCRC-RT, Camp Arifjan, Kuwait City, Kuwait, is the contracting activity (W912D1-05-D-0011).
Total Contract Value: $16,642,697

Principle Contractor: Tepa Ec LLC [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Tepa Ec, LLC, Colorado Springs, Colo., was awarded on Dec. 16, 2009, a $15,294,000 firm-fixed-price contract for the construction of a battalion complex, company operation facility and unmanned vehicle hangar. Work is to be performed in Fort Carson, Colo., with an estimated completion date of June 30, 2011. Bids were solicited via the World Wide Web with three bids received. U.S. Army Corps of Engineers, Omaha District, Omaha, Neb., is the contracting activity (W912HN-08-D-0022).
Total Contract Value: $15,294,000

Principle Contractor: Scitor Corporation [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Air Force [ VIEW ALL ]

Contract Details: The Scitor Corp., El Segundo, Calif., was awarded a $15,000,000 contract to extend advisory and assistance services to the Space Based Infrared Systems Wing for a period of six months starting Jan. 1, 2010. At this time, $4,605,965 has been obligated. ISSW/PK, El Segundo, Calif., is the contracting activity (FA8810-09-C-0002).
Total Contract Value: $15,000,000

Principle Contractor: Bell Helicopter Textron, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Bell Helicopter Textron, Inc., Hurst, Texas, was awarded on Dec. 17, 2009, a $13,215,299 firm-fixed-price contract for the upgrade of 270H-58D Kiowa Warrior aircraft Control Display System (CDS) version 2 to the current CDS4 configuration. Work is to be performed in Hurst, Texas, with an estimated completion date of April 30, 2011. One bid was solicited with one bid received. U.S. Army Contracting Command, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-09-C-0065).
Total Contract Value: $13,215,299

Principle Contractor: Alcatel-Lucent USA, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Alcatel-Lucent USA, Inc., McLeansville, N.C., was awarded on Dec. 18, 2009, a $12,838,294 firm-fixed-price contract for the acquisition in support of the Installation Information Infrastructure Modernization program for Fort Benning. Work is to be performed in Fort Benning, Ga., with an estimated completion date of July 1, 2013. 10 bids were solicited with four bids received. Army Contracting Command, NCRCC-ITEC4, Alexandria, Va., is the contracting activity (W91QUZ-06-D-0027).
Total Contract Value: $12,838,294

Principle Contractor: Altech, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Altech, Inc., Texarkana, Texas, was awarded on Dec. 16, 2009, a $12,613,690 firm-fixed-price contract for the design/build of an Armed Forces Reserve Center at Red River Army Depot, Texas. Work is to be performed in Red River, Texas, with an estimated completion date of May 1, 2011. Bids were solicited on the World Wide Web with nine bids received. U.S. Corps of Engineers, Louisville District, Louisville, Ky., is the contracting activity (W912QR-10-C-0019).
Total Contract Value: $12,613,690

Principle Contractor: BAE Systems [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: BAE Systems, York, Pa., was awarded on Dec. 23, 2009, a $12,575,761 cost-reimbursable, no-fee contract. A combination of funds from operations and maintenance reset and the Army Working Capital Fund are being used to fund the termination liability schedule. Work is to be performed in York, Pa., with an estimated completion date of Nov. 31, 2010. One bid was solicited with one bid received. TACOM, CCTA-AHL-A, Warren, Mich., is the contracting activity (W56HZV-05-G-0005).
Total Contract Value: $12,575,761

Principle Contractor: Flynco, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Flynco, Inc., Little Rock, Ark., was awarded on Dec. 22, 2009, a $12,549,078 construction firm-fixed-price contract for the design/build of an Armed Forces Reserve Center at Pine Bluff, Ark. Work is to be performed in Pine Bluff, Ark., with an estimated completion date of May 1, 2011. Bids were solicited via the FedBizOpps Web site with eight bids received. U.S. Army Corps oF Engineers, Louisville District Office, CELRLCT-M, Louisville, Ky., is the contracting activity (W912QR-10-C-0022).
Total Contract Value: $12,549,078

Principle Contractor: EADS North American Defense [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: EADS North American Defense, Arlington, Va., was awarded on Dec. 18, 2009, a $11,733,285 firm-fixed-price contract. This contract is for the funding of program year 05 of the Armyís utility helicopter for six hoist B-kits, 624 hours of contractor field team in support of the main post helipad at the National Training Center. Work is to be performed in Arlington, Va., with an estimated completion date of June 30, 2016. One bid was solicited with one bid received. U.S. Army Contracting Command, CCAM-BH-C, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-06-C-0194).
Total Contract Value: $11,733,285

Principle Contractor: DeRossi and Son Company [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Defense Logistics Agency [ VIEW ALL ]

Contract Details: DeRossi & Son Co.*, Vineland, N.J., is being awarded a maximum $11,644,200 firm fixed-price, total set-aside, indefinite-delivery/indefinite-quantity contract for menís dress coats. There are no other locations of performance. Using service is Army. The original proposal was Web solicited with four responses. Contract funds will expire at the end of the current fiscal year. The date of performance completion is April 30, 2011. The contracting activity is the Defense Supply Center Philadelphia, Philadelphia, Pa., (SPM1C1-10-D-1029).
Total Contract Value: $11,644,200

Principle Contractor: Costello Construction of Maryland [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Costello Construction of Maryland, Columbia, Md., was awarded on Dec. 22, 2009, a $10,503,200 design-build firm-fixed-price contract. This contract is a two-phase design-build for a new National Museum of Health and Medicine to be built at Forest Glen Annex, Md. The museum currently resides at Walter Reed Medical Center, Washington, D.C. Work is to be performed in Silver Spring, Md., with an estimated completion date of April 1, 2011. One bid was solicited via the FedBizOpps Web site with seven bids received. U.S. Army Corps of Engineers, Baltimore District, Baltimore, Md., is the contracting activity (W912DR-10-C-0005).
Total Contract Value: $10,503,200

Principle Contractor: Rockwell Collins, Simulation and Training Solutions [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Rockwell Collins, Simulation and Training Solutions, Sterling, Va., was awarded on Dec. 21, 2009, a $10,304,294 firm-fixed-price contract for the procurement of one transportable Blackhawk operations simulator device nine, Bahrain military sales. Work is to be performed in Sterling, Va., with an estimated completion date of Sept. 30, 2013. One bid solicited with one bid received. U.S. Army Contracting Command, CCAM-BH-C, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-08-C-0257).
Total Contract Value: $10,304,294

Principle Contractor: ENSCO, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: ENSCO, Inc., Falls Church, Va., was awarded on Dec. 22, 2009, a $9,705,275 cost-plus-fixed-fee contract for the support for the system survivability analysis, modeling and balanced survivability assessments program. Work is to be performed in Falls Church, Va., with an estimated completion date of Dec. 31, 2011. One bid was solicited with one bid received. Defense Threat Reduction Agency, Fort Belvoir, Va., is the contracting activity (HSTRA1-07-C-0049).
Total Contract Value: $9,705,275

Principle Contractor: Weeks Marine, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Weeks Marine, Inc., Covington, La., was awarded on Dec. 21, 2009, a $7,908,571 firm-fixed-fee contract. This contract is for the passes of the Mississippi River, Southwest Pass maintenance dredge, cutterhead or dredge rental contract No. 1-2009, mile 5.0 AHP to 19.5 BHP, C/L Sta. 2925+20 to C/L Sta., Plaquemines Parish, La. The work consist of furnishing one fully crewed and equipped cutterhead or dustpan dredge and attendance plant with a dredge discharge size not less than 27 inches inside diameter nor greater than 30 inches on a rental basis. Work is to be performed at the Mississippi River Southwest Pass area and possible areas of the New Orleans District, with an estimated completion date of Apr. 23, 2010. Bids were solicited on the World Wide Web with two bids received. U.S. Army Corps of Engineers, New Orleans District, New Orleans, La., is the contracting activity (W912P9-10-C-0028).
Total Contract Value: $7,908,571

Principle Contractor: Creek Services LLC [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Creek Services, LLC, Gretna, La., was awarded on Dec. 21, 2009, a $7,857,398 firm-fixed-price contract. This contract is for the construction of the Atchafalaya Basin Levee E-40 project. The work consist of levee enlargement; cleaning and grubbing; fertilizing; seeding and mulching levee crown; ramps and access road surfacing; and other incidental work. Work is to be performed in Iberville Parish, La., with an estimated completion date of June 26, 2011. Bids were solicited on the World Wide Web with 13 bids received. U.S. Army Corps of Engineers, New Orleans District, New Orleans, La., is the contracting activity (W912P8-10-C-0025).
Total Contract Value: $7,857,398

Principle Contractor: Kaman Aerospace Corporation, Helicopter Division [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Kaman Aerospace Corp., Helicopter Division, Bloomfield, Conn., was awarded on Dec. 22, 2009, a $7,152,540 firm-fixed-price contract to exercise the option for application of corrosion prevention blade coating on 500 government furnished blades for installation on the UH/HH-60M aircraft. Work is to be performed in Bloomfield, Conn., with an estimated completion date of March 31, 2014. One bid was solicited with one bid received. U.S. Army Contracting Command, CCAM-BH-A, Redstone Arsenal, Ala., is the contracting activity (W58RGZ-09-C-0155).
Total Contract Value: $7,152,540

Principle Contractor: AAI Corporation [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: AAI Corp, Hunt Valley, Md., was awarded on Dec. 23, 2009, a $7,109,408 cost-plus-fixed-fee contract. This is an indefinite-quantity contract with five ordering periods. Task order 0003, with funding modifications 01 through 04, is for unmanned aerial vehicle systems engineering and technical support. Funds are obligated upon the issuance of each order period/task order/modification. The contract minimum level of effort is 146 man-hours of engineering, technical and support labor. Engineering and technical services are required to support Joint Technology Center/Systems Integration Laboratory research, development and engineering tasks conducted by the contractor on its fleet of unmanned aerial vehicles and related interfaces, components, processes, capabilities and architectures. Work is to be performed in Redstone Arsenal, Ala. (95 percent), and Hunt Valley, Md. (5 percent), with an estimated completion date of Aug. 31, 2013. One bid was solicited with one bid received. U.S. Army Contracting Command, Aviation and Missile Contracting Center, CCAM-RD-A, Redstone Arsenal, Ala., is the contracting activity (W31P4Q-08-D-0035).
Total Contract Value: $7,109,408

Principle Contractor: Healtheon, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Healtheon, Inc., New Orleans, La., was awarded on Dec. 23, 2009, a $5,898,178 firm-fixed-price contract for HUBZone MATOC, Lake Pontchartrain and vicinity, north of Airline Highway, Bayou Trepagnier Complex floodwall, Phase 2. Work is to be performed in St. Charles Parish, La., with an estimated completion date of June 6, 2011. 11 bids were solicited with eight bids received. U.S. Army Corps of Engineers, New Orleans District, New Orleans, La., is the contracting activity (W912P8-09-C-0043).
Total Contract Value: $5,898,178

Principle Contractor: Logistics Value Integrations, Incorporated [ VIEW ALL ]
Date Reported: 12/31/2009
Department: Army [ VIEW ALL ]

Contract Details: Logistics Value Integrations, Inc., Fairfax, Va., was awarded on Dec. 16, 2009, a $10,621,534 labor-hour contract for the services for the non-army managed items asset management system. Work is to be performed in Rock Island, Ill., with an estimated completion date of Dec. 16, 2010. One bid was solicited with one bid received. TACOM-Rock Island, CCTA-AR-FB, Rock Island, Ill., is the contracting activity (W56HZV-10-F-0011).
Total Contract Value: $1,062,534